Spec Sheets
Attached are Construction Specification Sheets showing the correct way to hook up your temporary or permanent service.
Using generators during a "major" outage can be very dangerous to both the occupants of the home and the linemen working on the lines if not hooked up correctly (see the GENERATOR-Double Throw Safety Switch guideline sheet).
** ROW Easements must be printed on legal size paper. This is required by the courthouse for legal filing.